E03 to be opened in October 2013 |
The Authority said that only fixing of sign boards and planting of trees along the expressway are being carried out at present.
The
expressway will have three lanes each side from Colombo to Peliyagoda
and two lanes each side from Peliyagoda to Katunayake. There will be
three inter changes on this expressway.
When
the expressway opened, the time to travel from Colombo to the Airport
will be reduced to about 15 minutes from the current one hour.